Licensed plumbers, clean work, and tubs that last decades

Bathtub Installation Kent WA done right the first time

Bathtub Installation Kent WA homeowners can count on starts with a proper assessment of your existing drain, supply lines, and subfloor. Whether you need a standard alcove tub or a walk in bathtub installation Kent WA, our licensed plumbers handle the full job from removal to final caulk line. We serve King County with same-day estimates and upfront pricing.

↗
Fast online booking

Request service today

Tell us what is happening. Our local team will confirm your visit shortly.

Call Now (833) 453-9020 → No spam. No obligation. Just practical help.
Bathtub Installation
Careful work. Honest options.
About this service

What Bathtub Installation Kent WA actually involves

Bathtub Installation Kent WA is a licensed plumbing service that removes your old tub, checks the drain and supply lines, sets the new unit level, and connects everything to Uniform Plumbing Code (UPC) standards. It is needed when a tub cracks, leaks, stains permanently, or no longer fits how you use the bathroom. The job usually takes four to eight hours for a standard alcove tub and one to two days for a walk-in model with a tile surround.

Most Kent homes built before 1990 still have original cast iron or galvanized steel tubs. Those units rust from the inside out, and the drain shoe often corrodes into the subfloor. If you have been searching for bathtub replacement near me Kent, the real question is whether the drain and overflow assembly can survive removal. In many Kent East Hill and Panther Lake homes, we find soft subfloor around the drain that needs repair before the new tub goes in.

  • ✓ Stop hidden drain leaks
  • ✓ Restore water pressure
  • ✓ Remove trip hazards
  • ✓ Add real resale value
What's included

What is included in our bathtub installation

Every bathtub installation Kent WA job includes the core work: removal, disposal, new drain assembly, and a tested, level tub. Add-ons like tile surround, new faucet, or subfloor repair are quoted separately so you can see exactly what you are paying for.

✓

Old tub removal and haul-away

We cut out the old tub, protect your door frames and flooring, and haul the unit away. Cast iron tubs come out in sections so they fit through standard doorways without damaging the walls.

✓

New drain and overflow assembly

We install a new drain shoe, overflow plate, and gasket, connected with PVC or ABS pipe. The trap arm is sloped to code and the connection is tested with a full tub of water before we call the job done.

✓

Supply line connection

New supply lines from the shut-off valve to the tub filler, in PEX piping or copper. We replace the shut-off valves if they are seized or corroded, and we pressure-test the lines before closing the wall.

✓

Tub set in mortar base

We set the tub in a mortar bed so it does not flex, squeak, or crack the caulk line. A level tub drains fully and looks right against the surround for years.

✓

Permit and inspection coordination

When the job requires a permit, we pull it and schedule the inspection. That keeps the work code-correct and gives you documentation if you sell the home later.

✓

Final water test and cleanup

We fill the tub, check every connection, and inspect the caulk line. Then we clean up the work area and walk you through what we did and how to care for the new finish.

How it works

How our bathtub installation process works

01

On-site assessment

We measure the alcove, check the drain location, and test the shut-off valves. If the subfloor is soft or the drain line is cast iron, we tell you before we start. You get a written price the same day, usually within 90 minutes of arrival.

02

Removal and prep

We shut off the water, disconnect the supply lines, and cut the old tub free. Cast iron tubs come out in sections to protect your door frames and flooring. We haul the old unit away and inspect the subfloor for rot, then sister in new framing where needed.

03

Rough-in plumbing

New supply lines go in first, either PEX piping or copper. We set the drain and overflow with new PVC pipe, check the trap arm slope, and pressure-test the connections. If you are adding a shower valve, this is when it gets soldered or pressed into place.

04

Tub set and level

We set the new tub in a mortar base so it does not flex or squeak. A level tub drains fully and keeps the caulk line even. We connect the drain shoe, tighten the overflow gasket, and check for leaks with the tub filled to the rim.

05

Final test and cleanup

We run hot water through the tub, check the shut-off valves, and inspect the caulk line. You get a walkthrough of what we did and how to care for the finish. We leave the bathroom broom-clean and take all debris with us.

Tools & methods

Tools and methods we use

Purpose-built equipment, used by trained technicians — so the job is done accurately the first time.

Video inspection camera

Lets us see inside the drain line before and after the tub install. We check for cracks, root intrusion, and bellies in the pipe that would cause slow drains later.

Hydro jetter

Scours soap scum, hair, and scale off the inside of the drain pipe. We use it when a snake cannot clear the clog or when the line has heavy buildup.

Pipe cutter and press tool

Cuts and joins copper and PEX piping cleanly. The press tool makes a permanent, leak-free connection without soldering near wood framing.

Propane torch

Used for soldering copper supply lines and fittings when we are replacing the shut-off valves or tub filler behind the wall.

Leak detection microphone

Picks up the sound of water escaping behind a wall or under a slab. We use it when the leak source is not obvious from the tub itself.

Drain snake and plumber's auger

Clears clogs in the branch line and main sewer line. We run the correct size for the pipe diameter so we do not damage the pipe walls.

Real results

Before and after.

Rusted 1970s tub in Kent East Hill

Before

A 1974 steel tub with rust through the drain area and a slow drain. The subfloor around the drain was soft from years of slow leaking. The homeowner had been putting a towel down after every shower.

After

We removed the old tub, replaced a 2-foot section of subfloor, and installed a new Kohler acrylic tub with a new PVC drain assembly. The drain now flows freely and the floor is dry. Job took one day.

Walk-in tub for a Panther Lake retiree

Before

An 82-year-old homeowner had stopped using the tub because the 16-inch wall was too high to step over safely. She was using the shower only, which was also a fall risk.

After

We installed a walk-in tub with a 3-inch threshold, built-in seat, and grab bars anchored into framing. The pump was wired to a new GFCI outlet. She now uses the tub daily without help.

Cast iron drain repair in Downtown Kent

Before

A 1950s home near James Street had a tub that drained slowly and a water stain on the ceiling below. The cast iron drain line under the tub had cracked and was root-intruded at a joint.

After

We removed the tub, replaced a 4-foot section of cast iron with PVC pipe, and installed a new American Standard tub. The line was scoped after repair and showed clean flow. No more ceiling stain.

Problems we solve

Bathtub problems we solve in Kent WA

Most tub problems start small and get expensive fast. Here are the ones we see most often in Kent homes, and what happens if you wait.

Ask a pro →
01

Tub drains slowly or backs up

We run a drain snake or hydro jetter through the branch line to clear the clog. If the line is cast iron and scaled, we scope it with a video inspection camera and recommend repair or replacement before the new tub goes in.

↗
02

Rust stains or cracks in the tub finish

We remove the failing tub and install a new one with a fresh drain assembly. If the subfloor is soft, we sister in new framing before setting the new unit so it stays level and solid.

↗
03

Water stains on the ceiling below

We find the leak with a leak detection microphone or video camera, repair the drain assembly, and replace the tub if the leak has damaged the unit. We also check the shut-off valves and supply lines while the wall is open.

↗
04

Tub is too high to step into safely

We install a walk in bathtub installation Kent WA unit with a 3 to 4 inch threshold, a built-in seat, and grab bars anchored into framing. The door seal is tested with a full tub of water before we leave.

↗
Proof you can check

Licensed, insured, and warrantied

✓
Washington State Plumber LicenseWashington State Department of Labor & Industries
✓
Uniform Plumbing Code (UPC) ComplianceInternational Association of Plumbing and Mechanical Officials
✓
Washington Labor & Industries (L&I) RegistrationWashington State Department of Labor & Industries
✓
EPA WaterSense PartnerU.S. Environmental Protection Agency
✓
OSHA Safety CertificationOccupational Safety and Health Administration
Good questions

Frequently Asked Questions

(833) 453-9020 →

Most standard alcove tub installations in Kent run $1,200 to $3,500 in 2026, including removal, new drain assembly, and haul-away. Walk-in tubs with a pump and door seal run $4,500 to $9,000 installed. The cost to install a bathtub in Kent WA climbs if we find soft subfloor, corroded cast iron drain lines, or need to replace the shut-off valves and supply lines behind the wall.

A standard tub swap takes four to eight hours in one day. Walk-in tubs with a tile surround usually take one to two days because the surround has to set before the door seal is tested. If we find subfloor rot or need to re-route the drain, add a day. We give you a realistic timeline before we start, not after.

Yes. We install walk-in tubs from Moen, Delta, Kohler, and American Standard. The job includes setting the tub level, connecting the drain and supply lines, wiring the pump to a GFCI outlet, and testing the door seal with a full tub of water. We also check that the grab bars are anchored into framing, not just tile.

Pacific Plumbing LLC does bathtub replacement Kent Washington homeowners can schedule directly. We are licensed, insured, and based in King County. Call (833) 453-9020 and we can usually have a plumber out the same day for an estimate. We serve Kent, Covington, and the surrounding ZIP codes including 98031, 98030, and 98042.

Ready when you are

Schedule your Bathtub Installation Kent WA today

Call (833) 453-9020 and we will send a licensed plumber to your Kent home for a same-day estimate. We are bonded, insured, and we stand behind every tub we set. Upfront pricing, clean work, and a bathroom you can use the same day.

Get a Free Estimate (833) 453-9020 →
Request an appointment

Call Pacific Plumbing LLC

Reach us any hour at (833) 453-9020 for emergency service, or book a standard appointment during regular business hours. We answer live, not through a call center, and most non-emergency calls get scheduled the same day. If you're in Kent, Covington, or anywhere in King County, we're already in the neighborhood.

Tap to call(833) 453-9020